Our Projects
current projects
A new turn-key 120/11kV Substation for a Copper/Cobalt Mine located in Katanga Provice in the Democratic Republic of Congo. The project includes 3 off 36/40MVA Power Transformers. Long Line Technology is providing all engineering (design and specification), procurement, transportation, construction and installation.
Previous
Next
completed projects
Project Description | End User / Client | Project Value |
---|---|---|
Mutanda 20MW Power Station (Containerized 0.4/22kV Diesel Generator Power Station, including co-generation and islanding) | Mutanda Mining SPRL (Kolwezi, DRC) | USD 10 million |
Monawood 132/33kV Power Project (Substation, Generation, Reticulation Power System Integration, Network Studies) | Monawood Smelter / Power Line Africa (Harare, Zimbabwe) | USD 5.0 million |
Mutanda 22kV Plant – System Study including electrical model to 400V level, Plant Earth Grid Design to IEE-80 including hazardous areas | Mutanda Mining / SENET PTY Ltd (Kolwezi, DRC) | USD 0.5 million |
Tenke/Fungurume 220kV and 120kV Circuit Breaker Replacement Project | Mutanda Mining / SNEL (Kolwezi, DRC) | USD 1.2 million |
Kansuki 120/22kV Power Project (OHL, Power Transformers, 12MW Power Station, MV distribution LV Reticulation, LV switchgear) | Kansuki Mining / SNEL (Kolwezi, DRC) | USD 33 Million |
Mutanda Phase 4 (OHL, Power Transformers, Emergency Generation, MV distribution LV Reticulation, LV switchgear) | Mutanda Mining SPRL, (Kolwezi, DRC) | USD 16 million |
KCC EW-4 Plant – (OHL, Power Transformers, PFC/Harmonic filters, MV distribution LV Reticulation, LV switchgear) | Komoto Copper Corporation / SNEL (Kolwezi, DRC) | USD 22 million |
Mutanda 120/22kV 103MVAr Static VAr Compensator (SVC) | Mutanda Mining SPRL. (Kolwezi, DRC) | USD 4.3 million |
Fungurume 220/120/6,6kV 150MVA Power Transformer Project | Megatron RDC / Congo Energy / SNEL (Fungurume, DRC) | USD 6.5 million |
SEK 120/11kV Substation, 11kV Reticulation, 120kV Tee-off and PFC/harmonic filters | Megatron RDC / Tiger Resources (Kolwezi, DRC) | USD 6 million |
12kWp Grid-connected Hybrid Solar (including integration with generator) | Addata Networks (JHB, RSA) | USD 25k |
Yanfolila Gold Mine – 6.6kV Overhead Line, Pole and Pad Mounted Transformers, Network Model, System Study and Settings | SENET Pty Ltd / Hummingbird Resources (Yanfolila, Mali) | USD 1.8 million |
Etoile (Chemaf) 11kV Harmonic Filter Banks and system study | ABB DMPC (Rectifiers), (Lubumbashi, DRC) | USD 0.4 million |
KCC (Komoto Copper Corporation) Sytem study and protection grading for new SX plant | SENET Pty Ltd (Glencore) (Kolwezi DRC) | USD 14k |
ENRC (Metalkol) – 120/33kV Network model and system study | SENET / ERG (Eurasian Resources Group) (Kolwezi, DRC) | USD 100k |
Mutoshi 120/11kV Power Project, 120/11kV Substation, 11kV Reticulation | CHEMAF S.A.R.L / SHALINA RESOURCES | USD 7.5 million |
Etoile (CHEMAF) 11kV Harmonic Filter Bank Spares | CHEMAF S.A.R.L / SHALINA RESOURCES | USD 52k |
Shilatembo 120kV Power Project Feasibility Study | Tiger Resources / SEK (Kolwezi, DRC) | USD 32k |
Yanfolila Gold Mine – 6.6kV 75kVA Transformers (Pit 2) | Hummingbird Resources (Yanfolila, Mali) | USD 56k |
The next step
For further information, enquiries and requests for quotation proceed to contact us.